Who needs a WPI-8E evaluation
The WPI-8E path exists for projects that are done — and were never certified while the work was happening. We handle WPI-8E evaluations for:
- Homeowners whose roof or addition was completed months or years ago without an appointed engineer.
- Property owners who bought a coastal home and later discovered there is no certificate on file.
- Contractors whose projects missed required inspection stages and now need to make it right for the owner.
- Structures that were built without permits entirely, where the owner needs engineering evidence of compliance for insurance.
What the WPI-8E evaluation involves
Because the engineer could not watch the work being built, the evaluation reconstructs the evidence after the fact. Depending on the project that typically means:
- Document review — permits, plans, product data, and any prior inspection records for the structure.
- Visual inspection of the completed work for code-required details: fastener patterns, underlayment, flashing, framing connections, opening protection.
- Selective testing where visual access is limited — for example fastener pull tests to verify deck attachment on a finished roof.
- Engineering analysis — when testing is not possible, a licensed PE can sometimes demonstrate compliance through calculations accepted by TDI.
What happens if the work does not pass
If the evaluation finds deficiencies, the engineer documents them and prepares a remediation plan — the specific corrections needed for the structure to qualify for the WPI-8E. In many cases the fixes are limited and inexpensive (adding fasteners, correcting flashing details). Once your contractor completes the remediation, we re-inspect and file the certificate. You are never left guessing: you get a clear list of exactly what must change and why.
Cost and turnaround for WPI-8E work
Because the evaluation is more involved than staged inspections, completed-construction projects carry a surcharge ($250 to $1,000 depending on project type) on top of the base certification price — for example, residential re-roofing starts at $500 plus the surcharge and per-square-foot component. Standard turnaround is about 14 days from deposit to TDI submission; rush service (5 days) is available when a closing or insurance deadline is pressing.